Construction Hours

City Code 130.45 restricts the hours of operations from 7 a.m. to 10 p.m. on weekdays, and from 9 a.m. to 9 p.m. on weekends and holidays.

Contractors installing new road

Development

Print
Press Enter to show all options, press Tab go to next option

Looking to build or develop in Shakopee? Here is information you need to know:

Choosing a Site

Our Economic Development Division can assist with finding an appropriate site for your project.

Meeting Design Standards 

The Engineering Division will assist you in ensuring your project meets the city’s design criteria for new construction for street and utility improvements. City engineers review projects and set conditions for roads and utilities to ensure projects meet these design standards.

Developing your Site

If your project requires a conditional-use permit, our Planning Division can walk you through the process. New residential developments require preliminary and final plats.

Larger projects may also be invited to present preliminary plans at the city’s Development Review Committee (DRC) meetings. These are comprised of representatives from various city departments. The DRC typically meets Wednesday mornings. Please contact Planning Division staff to get on the agenda.

Applying for Permits

Most city permits can be purchased online through ePermits. The city also uses electronic plan review software.

Fireworks Permit

Permits are required for fireworks indoor or outdoor shows or for special effects. The city has two types of permits:

Indoor or special effect

Required documentation:

  • A plan for use of the pyrotechnics as required by NFPA 1126 – 2006 Edition – Sections 6.2 and 6.3.
  • A copy of the Certificate of Insurance with the City of Shakopee as the listed Certificate Holder.

Outdoor use

Required documentation:

  • Site plan including location of the display devises; location of any buildings, roads, and overhead obstructions; and lines behind which the audience will be kept.
  • A copy of the Certificate of Insurance with the City of Shakopee as the listed Certificate Holder.

Return to full list >>

Tree Management and Landscaping

 The city has established tree preservation regulations for residential and commercial development. If your project site has existing trees, it may be subject to these regulations. For more information, visit Tree Management for Developers.

The city has established landscaping requirements for all residential, commercial and industrial new construction.

Business Utilities

Sanitary Sewer and Storm Water

Water and Electric

Water and electric services within the City of Shakopee are municipally-owned but independently operated by Shakopee Public Utilities (SPU). You can find SPU applications on its website at spucweb.com.

A portion of industrial land along County Road 101 in Shakopee receives electric service from Xcel Energy. See the Minnesota Public Utilities Commission’s Electric Utility Services Area map. Find more information about Xcel Energy’s services at www.xcelenergy.com.